国产精品无码无卡无需播放器-国产精品无码无片在线观看3d-国产精品无码无在线观看-国产精品无码午夜福利-国产精品无码一本二本三本色-国产精品无码一二区免费

首頁 產品展示>Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成

Perkins珀金斯850-854F柴油發動機T412827活塞總成供應商,Perkins珀金斯850-854F柴油發動機T412827活塞總成技術價格規格咨詢服務,Perkins珀金斯850-854F柴油發動機T412827活塞總成零配件供應,Perkins珀金斯850-854F柴油發動機T412827活塞總成售后服務中心,Perkins珀金斯850-854F柴油發動機T412827活塞總成,Perkins珀金斯850-854F柴油發動機T412827活塞總成詳細的技術參數,
產品咨詢

詳細描述

項目   零配件號碼    最新件號   描述  

    1   T412827    4   T412827    活塞及圈總成        

    (1) T418484    4   T418484    活塞及圈總成 -O/S       

    7   T412812    4   T412812    連桿總成         

    10  T412845    4   T412845    大頭軸承總成        

    (10)   T412807    4   T412807    連桿瓦總成 -U/S         

    (10)   T412850    4   T412850    連桿瓦總成 -U/S            

Cylinder block top face

To inspect

Operation 7-2

Inspect the cylinder block top face for cracks, damage and distortion in the same way as for the cylinder head,

refer to Operation 3-19.

If outside limit, renew the cylinder block.

Distortion mm (in)

Standard

Service limit

Less than 0,05 (0.002)

0,12 (0.005)

Note:   For emissions approved engines. If a new cylinder block is fitted, the engine should be tested on an

engine test brake and the fuel adjustment screw set. This procedures is only done by a Perkins approved

dealer. This will ensure that the engine will conform with emissions legislation.

2

1

A

84

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

100 Series

8

Engine timing

8

Fuel injection pump timing

To check timing

Operation 8-1

Special requirements

Special tools

Description

Torque Nm (lbf ft) kgf m

Part number

Fuel pump spill pipe

21825680

Delivery valve holder

42 (31) 4,2

1  Set the piston for number 1 cylinder to TDC on the compression stroke. Turn the crankshaft counter-

clockwise a quarter of a revolution.

2  Disconnect or remove the ESOS, HP pipes and LP fuel inlet pipes from pump (A).

3  Ensure the throttle lever is held in the maximum fuel position after the procedure.

4  Remove the delivery valve holder for number 1 cylinder and remove the delivery valve. Store the delivery

valve in appropriate clean fuel until assembly.

Note:  The fuel pump may need to be moved to an upright position to remove and to fit the delivery valves.

Continued

Workshop Manual, TPD 1377E, issue 4

85

This document has been printed from SPI². Not for Resale


 

8

100 Series

5  Connect a suitable tank, which has a tap and contains 0,2 litres (¼ pint) of clean fuel, to the pump inlet.

6  Connect the fuel pump spill pipe to the delivery valve holder for number 1 cylinder. Put a suitable waste fuel

container below the pipe neck and open the tap, if correctly set fuel should flow (B).

Note:   The outlet from the tank should be approximately 152 mm (6 in) above the pump.

7  Turn the crankshaft slowly until the flow of fuel reduces to a drop which falls from pipe neck every 7-10

seconds. This is then the timing point.

8  Use the value shown by the timing mark (C1) with the injection timing tables given in "Injection timing" on

page 15.

1

Continued

86

Workshop Manual, TPD 1377E, issue 4

This document has been printed from SPI². Not for Resale


 

8

100 Series

9  If engine timing is incorrect adjust the thickness of shim (D2) to correct.

Note:  If the shim thickness is adjusted by 0,1 mm, the timing will alter by approximately one degree. An

increase in the number of shims will retard the timing, but if the number of shims are decreased this will

advance the timing.

10  Fit the delivery valve.

Notes:

Ensure that the delivery valve holder (D1) is tightened to the specified torque.

For emissions approved engines. If it is necessary to change the fuel injection pump, the fuel delivery must

be reset on a suitable test dynamometer with the new pump. The procedure above, on injection pump

timing explains how to change the timing.

When changing the timing, it is important that this procedure is done before the engine is tested on a

suitable dynamometer.

2

1

Workshop Manual, TPD 1377E, issue 4

87

This document has been printed from SPI². Not for Resale

 

免費熱線
400-082-9096?
整機銷售
0731-84424871? 18374999699
售后維修
0731-84424872? 15580888444
配件銷售
0731-84424873? 18274802060
手機端
微信公眾號
主站蜘蛛池模板: 国产精品456 | 九九久久精品国产 | 俄罗斯三级毛片 | 国产深夜福利视频在线观看 | 国产小网站 | 淫综合网 | 国产做国产爱免费视频 | 精品无人区乱码一区二区 | 成人欧美一级毛片免费观看 | 免费一级毛片在线播放 | 久青草国产免费观看 | 国产欧美日韩精品高清二区综合区 | 91精品全国免费观看老司机 | 国产成人高清 | 亚洲综合a| 久久久久久国产视频 | 国产欧美另类久久精品91 | 国产91精品久久久久久久 | 亚洲成a人片毛片在线 | 不卡精品国产_亚洲人成在线 | 欧美成人免费 | 99久久久精品 | 国产精品免费观看网站 | 亚洲国产观看 | 99精品国产高清自在线看超 | 玖玖在线国产精品 | 野外一级毛片黑人 | 久久伊人成人网 | 国产a久久精品一区二区三区 | 精品精品国产自在久久高清 | 五月综合激情网 | 久9视频这里只有精品8 | 97视频免费播放观看在线视频 | 中文精品北条麻妃中文 | 一区二区三区免费在线视频 | 离线枕边人国语在线影视 | 日韩欧美视频在线一区二区 | 欧美日韩一区二区视频免费看 | 日韩欧美h| 成人精品亚洲人成在线 | 国产成人综合久久 |